Construction work and maintenance under the project: "The first stage of the Complex of facilities for decontamination, transportation, processing and disposal of radioactive waste from areas contaminated by Chernobyl accident (“Vector”) - adjustment".
The site of the "Vector" complex is located in a 30-kilometer exclusion zone and directly in a 10-kilometer zone of enhanced radioecological control.
Construction of "Vector" facilities complex launched in March 1998.
Within the construction completion, the project provides for the new construction of the following facilities:
construction of a patrol road;
thermal insulation together with corrugated steel sheet cladding of facades and roofs of change facility with laboratory.
machinery repair shop with a cylinder storage rack;
5-vehicle shed with inspection ramp.
It is necessary to finish the installation of process equipment at the following facilities:
solid radioactive waste storage facility (SRW-1);
solid radioactive waste storage facility (SRW-2);
administrative and amenity building (AAB-I, AAB-2), canteen;
change facility with laboratory;
CCP with guard desk;
fire station.
container preparation facility;
car wash;
station for the biological treatment of waste water.
Execution of residual volumes of general construction works at the following objects:
1. Solid radioactive waste storage facility (SRW-2):
installation of perimeter sewage system.
2. Solid radioactive waste storage facility (SRW-2):
installation of temporary facility steel structures;
aspiration and dust suppression system arrangement;
communication tunnel construction;
water supply and sewerage;
electric power equipment;
electric lighting;
grounding and lightning protection;
installation of gutters and gully holes;
external power supply;
footpaths to the gallery.
3. AAB-1: heating and heat supply unit; ventilation and air conditioning;
4. AAB-2: ventilation and air conditioning.
5. canteen:
ventilation.
6. Brick gallery: ventilation and air conditioning.
7. Change facility with laboratory:
electrical works.
1. Container preparation facility:
utility and storm water drainage;
ventilation;
power electrical equipment and electric lighting.