Construction work and maintenance on the "Vector" facility

Construction work and maintenance under the project: "The first stage of the Complex of facilities for decontamination, transportation, processing and disposal of radioactive waste from areas contaminated by Chernobyl accident (“Vector”) - adjustment".

Description:

The site of the "Vector" complex is located in a 30-kilometer exclusion zone and directly in a 10-kilometer zone of enhanced radioecological control.

Construction of "Vector" facilities complex launched in March 1998.

Kinds of works:

Within the construction completion, the project provides for the new construction of the following facilities:

I start-up complex:

  • construction of a patrol road;

  • thermal insulation together with corrugated steel sheet cladding of facades and roofs of change facility with laboratory.

II start-up complex:

  • machinery repair shop with a cylinder storage rack;

  • 5-vehicle shed with inspection ramp.

It is necessary to finish the installation of process equipment at the following facilities:

I start-up complex:

  • solid radioactive waste storage facility (SRW-1);

  • solid radioactive waste storage facility (SRW-2);

  • administrative and amenity building (AAB-I, AAB-2), canteen;

  • change facility with laboratory;

  • CCP with guard desk;

  • fire station.

 II start-up complex:

  • container preparation facility;

  • car wash;

  • station for the biological treatment of waste water.

Execution of residual volumes of general construction works at the following objects:

I start-up complex:

1. Solid radioactive waste storage facility (SRW-2):

  • installation of perimeter sewage system.

2. Solid radioactive waste storage facility (SRW-2):

  • installation of temporary facility steel structures;

  • aspiration and dust suppression system arrangement;

  • communication tunnel construction;

  • water supply and sewerage;

  • electric power equipment;

  • electric lighting;

  • grounding and lightning protection;

  • installation of gutters and gully holes;

  • external power supply;

  • footpaths to the gallery.

3. AAB-1: heating and heat supply unit; ventilation and air conditioning;

4. AAB-2: ventilation and air conditioning.

5. canteen:

  •  ventilation.

6. Brick gallery: ventilation and air conditioning.

7. Change facility with laboratory:

  • electrical works.

II start-up complex:

1. Container preparation facility:

  • utility and storm water drainage;

  • ventilation;

  • power electrical equipment and electric lighting.