• Customer-
  • LocationChernigov region
  • StatusIn work
  • CategoryPonds and beaches

«Construction of ash accumulator №3 »

Description:

Ash accumulator is built in the place of tailing ponds No.1 and No.2 of "Chernihivvsherst", located in the south-west of Chernihiv.

Kinds of works:

Pond No.1

  • construction of the temporary drainage network of the ash accumulator within the tailing pond No.1;

  • construction of the foundation and screen of the ash collector within the tailing pond No.1;

  • reclamation of the ash accumulator within the tailing pond No.1.

Pond No.2

  • installation of the ash collector barrier within the tailing pond No.2;

  • construction of the temporary drainage network of the ash accumulator within the tailing pond No.2;

  • installation of the ash collector service zone within the tailing pond No.2;

  • construction of the foundation and screen of the ash collector within the tailing pond No.2;

  • raise of the protective dam of the ash accumulator within the tailing pond No.2;

  • reclamation of the ash accumulator within the tailing pond No.2.