Construction and installation work on the "Recovery of the safe enclosure of ChNPP Unit 4 Turbine Hall between axes 46-52 and A-B"
Description:
(SRS Store), including supply and installation of equipment
Kinds of works:
- preparatory work ( arrangement of access roads to the area of work performance, organization and arrangement of storage sites, cranes parking, etc.);
- dismantling work (dismantling of ceramsite concrete wall panels, dismantling of horizontal connection between columns, openings punching in the wall);
- assembly / disassembly of the main heavy-load crane;
- pre-assembly and installation of the unitized unit cover;
- consolidation of the top two damaged ceramsite concrete slabs;
- installation of walls shields in places of the dismantled wall panels.