Construction and installation work on the "Recovery of the safe enclosure of ChNPP Unit 4 Turbine Hall between axes 46-52 and A-B"

Description:

 (SRS Store), including supply and installation of equipment

Kinds of works:

  • preparatory work ( arrangement of access roads to the area of work performance, organization and arrangement of storage sites, cranes parking, etc.);
  • dismantling work (dismantling of ceramsite concrete wall panels, dismantling of horizontal connection between columns, openings punching in the wall);
  • assembly / disassembly of the main heavy-load crane;
  • pre-assembly and installation of the unitized unit cover;
  • consolidation of the top two damaged ceramsite concrete slabs;
  • installation of walls shields in places of the dismantled wall panels.